Kipling Generating Station (233.0 MW) - Kapuskasing: Mattagami River

The Lower Mattagami Project is a hydroelectric project that includes the addition of a new third generating unit to the existing two-unit Kipling Generating Station.

Existing Facility

The existing Kipling facility includes two vertical propeller turbine-generator sets, penstocks and draft tubes, and three existing single-phase transformers. Little Long has been in-service since the mid-1960’s.

Located 95 km north of Kapuskasing, Ontario, the facility is operated remotely from OPG’s Northeast Control Centre located at the Porcupine Transformer Station in Timmins, Ontario.

Expansion

The expansion includes one vertical propeller turbine-generator set, penstocks and draft tubes, and one new three-phase transformer. The addition of the new generating unit adds 78.3 MW to the existing capacity for a total site capacity of 233.3 MW at a head of 30.5 metres.

As part of the expansion, a tailrace gate hoisting system is installed on the existing powerhouse tailrace deck, extending over the new tailrace deck of the powerhouse extension.

Water from the Mattagami River is conveyed from the existing Kipling GS intake structure for the third generator unit to the new spiral case via a concrete encased steel penstock. The new generating unit is installed at the existing concrete structure. All three generating units share the same gravity dam and powerhouse. The new generating unit is connected to Hydro One’s 230kV L20D circuit.

Location: Harmon Township
River System: Mattagami River
Nameplate Capacity: 233.3 MW
OPA Contracted Capacity: 233.3 MW
Operator: Ontario Power Generation
Technology: Hydroelectric
Turbines: Three vertical propeller turbines
Originally Built: Mid-1960’s
Coordinate: 50° 08’ 55” N, 82° 12’ 34” W

 

Project Progress (June 30, 2014)

  • Stator winding, the hi-pot test and runner assembly were completed

  • The runner was installed in the turbine pit

  • Completed component installations in the unit include: the turbine and generator shafts, lower guide bearing, lower bracket; turbine thrust bearing, rotor spider, rotor rim and upper bracket

 
Links:

Ontario Power Generation Inc.

http://www.opg.com

Project Contacts:

Ontario Power Authority
 
Media and Public Relations
T. 416-969-6307 or 
1-800-797-9604
Ontario Power Generation Inc.

Media Relations
T. 416-592-4008 or
1-877-592-4008