Located 4 km from the outlet of Rainy Lake, the station is a run-of-river plant. The station’s civil structure extends across Rainy Lake and the US-Canada border and joins with Boise Cascade’s dam facilities located in International Falls, Minnesota. Peaking operations are restricted by a number of factors including the IJC-ordered Rainy Lake rule curves and minimum flows. Operations pertaining to levels and flows are governed under the International Rainy Lake Board of Control (IRLBC) control orders. The control orders specify the rule curve elevations and flow requirements for the combined Fort Frances-International dam operation. The combined facility is subject to an instantaneous minimum flow of 100 m3/s. The station is remotely controlled from the ACH LP Operating Center located in Oshawa.
Fort Frances station is categorized as close coupled, and has no penstocks. The station consists of a powerhouse, a concrete gravity section containing the spillway, ten sluice gates, and a canal section which hosts five sluice gates. Each generating unit is provided with two head gates, which are operated by a common electrically operated rack and pinion hoist. There are two distinct spillways associated with the station. The first spillway is a five bay canal structure located on the north side of the powerhouse. The gates are operated by a rack and pinion hoist. The second spillway is located on the south side of the station and consists of ten rack and pinion vertical operated lift gates. All spill flows for the Fort Frances/International Falls complex are associated with the Fort Frances facility. The headpond operates between the minimum elevation of 382.2 metres and maximum elevation of 382.75 metres.
Fort Frances is connected to the existing Hydro One 115kV circuit F2B and connects to Fort Frances TS.
This hydroelectric generating station generates approximately 57,000 MWh of renewable energy per year.
| Location: | 145 Third St. West, Fort Frances, ON |
| River System: | Rainy River |
| Nameplate Capacity: | 12.8 MW |
| OPA Contracted Capacity: | 10 MW |
| Operator: | AbitibiBowater |
| Technology: | Hydroelectric, run-of-river |
| Turbines: | Eight vertical propeller |
| Originally Built: | 1909 |
| OPA Contract Term Commencement Date: | December 1, 2009 |