Cascade Street Generating Station (1.2 MW) - Sequin River

Location: Parry Sound, ON
River System: Seguin River
Nameplate Capacity: 1.2 MW
OPA Contracted Capacity: 1.2 MW
Operator: Parry Sound PowerGen Corporation
Technology: Hydroelectric
Turbines: Two horizontal Francis turbines
Originally Built: 1919
Coordinate: 45°21'N, 80°01'W

Project Contacts:

Ontario Power Authority
 
Media and Public Relations
T. 416-969-6307 or 
1-800-797-9604