To view a PDF of the exhibit, please click the link on the exhibit number (i.e. E-1-1) or the Attachment.
|
E-1-1 |
Structure of Transmission Evidence |
|
E-2-1 |
Overview of Transmission Planning |
|
E-2-2 |
Facilitating the Development and Use of Renewable Energy and Enabling 2010 and 2025 Renewable Targets current version 080505 replaces original
| Attachment 1 |
All Inclusive LUEC Analysis of Renewable Resources |
|
Attachment 2 |
Study of Enabler Transmission in other Jurisdictions | |
|
E-2-3 |
Integrating Conservation |
|
E-2-4 |
Enabling Nuclear |
|
E-2-5 |
Enabling Natural Gas |
|
E-2-6 |
Enabling Coal Replacement |
|
E-2-7 |
Ensuring Reliability |
|
Projects to Facilitate and Enable Renewables |
|
E-3-1 |
North-South Transmission Reinforcement current version 071019 - replaces original
| Attachment 1 |
IESO System Impact Assessment for North-South Tie Upgrade |
|
Attachment 2 |
IESO System Impact Assessment for North-South Tie Upgrade – Addendum |
|
Attachment 3 |
Hardy Stevenson Report for North-South Transmission Reinforcement | |
|
E-3-2 |
Sudbury West Transmission Reinforcement
| Attachment 1 |
IESO Planning Study for Sudbury West Transmission Capability | |
|
E-3-3 |
Sudbury North Transmission Reinforcement current version 071019 - replaces original
| Attachment 1 |
IESO Planning Study for Sudbury North Transmission Capability |
|
Attachment 2 |
Hardy Stevenson Report for Sudbury North Transmission Reinforcement | |
|
E-3-4 |
East Lake Superior Transmission Reinforcement
| Attachment 1 |
Great Lakes Power Planning Study for East Lake Superior Transmission Capability |
|
Attachment 2 |
Hardy Stevenson Report for East Lake Superior Transmission Reinforcement | |
|
E-3-5 |
Manitoba Purchase Incorporation
|
|
E-3-6 |
Quebec/Labrador Purchase Incorporation
| Attachment 1 |
Hardy Stevenson Report for Quebec/Labrador Purchase | |
|
E-3-7 |
Incorporating Little Jackfish and East Lake Nipigon Renewable Resource Development
| Attachment 1 |
Hardy Stevenson Report for Little Jackfish and East Lake Nipigon Renewable Resource Development | |
|
E-3-8 |
Enabling Goderich Area Renewable Resource Development |
|
E-3-9 |
Enabling Bruce Peninsula Renewable Resource Development
| Attachment 1 |
Hardy Stevenson Report for Bruce Peninsula Renewable Resource Development | |
|
E-3-10 |
Enabling Manitoulin Island Renewable Resource Development current version 071019 - replaces original
| Attachment 1 |
Hardy Stevenson Report for Manitoulin Island Renewable Resource Development | |
|
Projects to Enable Nuclear |
|
E-4-1 |
Oshawa Area Transformer Station current version 071019 - replaces original
| Attachment 1 |
IESO Preliminary Assessment Report: Nuclear Scenarios in the GTA East | |
|
Projects to Ensure Reliability |
|
E-5-1 |
Northern York Region
| Attachment 1 |
IESO Report: System Impact Assessment Report for Holland TS | |
|
E-5-2 |
Kitchener-Waterloo-Cambridge-Guelph current version 080505 replaces version 071019 and original
| Attachment 1 |
IESO Report: System Impact Assessment for Cambridge Preston 115 /230 kV Auto | |
|
E-5-3 |
Southwest GTA current version 080505 replaces version 071019 and original
| Attachment 1 |
IESO Preliminary Assessment Report: Richview – Manby Adequacy |
|
Attachment 2 |
IESO Preliminary Assessment Report: Generation Incorporation in Southwest GTA | |
|
E-5-4 |
Windsor/Essex current version 071019 - replaces original
| Attachment 1 |
IESO Report: System Impact Assessment Report for Belle River TS | |
|
E-5-5 |
Central & Downtown Toronto current version 071019 - replaces original
| Attachment 1 |
IESO Preliminary Assessment Report: Manby/Leaside Normal and Emergency Transfer Study |
|
Attachment 2 |
IESO Preliminary Assessment Report: Manby – Leaside Adequacy |
|
Attachment 3 |
IESO Preliminary Assessment Report: New Transmission Options to Central Downtown Toronto |
|
Attachment 4 |
IESO Preliminary Assessment Report: Distribution Connected Generation in the Leaside 115 kV System |
|
Attachment 5 |
Hydro One: Summary of Asset Condition and Sustainment Plans for the Leaside and Manby 115 kV System |
|
Attachment 6 |
Hydro One: Toronto Third Supply Cost Estimates |
|
Attachment 7 |
Brookfield Power: Toronto Third Supply, HVDC Options for Supplying Downtown Toronto |
|
Attachment 8 |
Hardy-Stevenson: Project 7- Central and Downtown Toronto | |
|
E-5-6 |
Milton Transformer Station current version 071019 - replaces original |
|
Projects to Enable Coal Replacement |
|
E-6-1 |
Thunder Bay Area |
|
E-7-1 |
Third Party Supporting Evidence referenced within various Transmission evidence exhibits
| Attachment 1 |
NERC Transmission Planning Standards |
|
Attachment 2 |
NPCC Document A-2 – Basic Criteria for Design and Operation of Interconnected Systems |
|
Attachment 3 |
IESO Ontario Resource and Transmission Assessment Criteria (IMO_REQ_0041) | |
|
|
|